Umut A. Acar, Arthur Chargueraud, and Mike Rainey. Scheduling parallel programs by work stealing with private deques. In Proc. of the 18th ACM SIGPLAN Symposium on Principles and Practice of Parallel Programming, PPoPP '13, pages 219-228, New York, NY, USA, 2013. ACM
R. Bolze, F. Cappello, E. Caron, M. Daydé, F. Desprez, E. Jeannot, Y. Jégou, S. Lanteri, J. Leduc, N. Melab, G. Mornet, R. Namyst, P. Primet, B. Quetier, O.Richard, E-G. Talbi, and I. Touche. Grid'5000: A large scale and highly reconfigurable experimental grid testbed. Intl. Journal of High Performance Computing Applications, 20(4):481-494, Nov 2006
I. Chakroun, N. Melab, M. Mezmaz, and D. Tuyttens. Combining multi-core and gpu computing for solving combinatorial optimization problems. Journal of Parallel Distributed Computing, 73(12):1563-1577, 2013
M.R. Garey, D.S. Johnson, and R. Sethi. The complexity of flow-shop and job-shop scheduling. Mathematics of Operations Research, 1:117-129, 1976
S.M. Johnson. Optimal two and three-stage production schedules with setup times included. Naval Research Logistis Quarterly, 1:61-68, 1954
J.K. Lenstra, B.J. Lageweg, and A.H.G. Rinnooy Kan. A General bounding scheme for the permutation flow-shop problem. Operations Research, 26(1):53-67, 1978
N. Melab, I. Chakroun, and A. Bendjoudi. Graphics processing unitaccelerated bounding for branch-and-bound applied to a permutation problem using data access optimization. Concurrency and Computation: Practice and Experience, 26(16):2667-2683, 2014
M. Mezmaz, R. Leroy, N. Melab, and D. Tuyttensi. A multi-core parallel branch-and-bound algorithm using factorial number system. In Proc. of IEEE Intl. Parallel and Distributed Processing Symp. (IPDPS). Phoenix, Arizona, USA, May 2014
M. Mezmaz, N. Melab, and E-G. Talbi. A grid-enabled branch and bound algorithm for solving challenging combinatorial optimization problems. In Proc. of IEEE Intl. Parallel and Distributed Processing Symp. (IPDPS). Long Beach, California, USA, March 2007
Nir Shavit. Data structures in the multicore age. Commun. ACM, 54(3):76-84, March 2011
E. Taillard. Benchmarks for basic scheduling problems. Journal of Operational Research, 64:278-285, 1993